<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0"
    xmlns:dc="http://purl.org/dc/elements/1.1/"
    xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
    xmlns:admin="http://webns.net/mvcb/"
    xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#"
    xmlns:content="http://purl.org/rss/1.0/modules/content/">

    <channel>
    
    <title>CiTECH Energy Recovery Systems UK Ltd Latest News</title>
    <link>http://79.170.44.102/citech.co.uk/index.php</link>
    <dc:language>en</dc:language>
    <dc:creator>lorraine.taylor@citech.co.uk</dc:creator>
    <dc:rights>Copyright 2010</dc:rights>
    <dc:date>2010-11-03T15:59:43+00:00</dc:date>
    <admin:generatorAgent rdf:resource="http://expressionengine.com/" />
    

    <item>
      <title>Egypt LNG (ELNG)</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/egypt_lng_elng/</link>
      <guid>http://www.citech.co.uk/index.php/index/egypt_lng_elng/#When:15:59:43Z</guid>
      <description>Order from Egyptian Maintenance Company, Egypt</description>
      <dc:subject></dc:subject>
      <dc:date>2010-11-03T15:59:43+00:00</dc:date>
    </item>

    <item>
      <title>CiTECH Energy Recovery Systems UK Ltd gain ASME U accreditation</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/citech_energy_recovery_systems_uk_ltd_gain_asme_u_accreditation/</link>
      <guid>http://www.citech.co.uk/index.php/index/citech_energy_recovery_systems_uk_ltd_gain_asme_u_accreditation/#When:15:36:18Z</guid>
      <description>CiTECH Energy Recovery Systems UK Ltd have recently become authorised to use the &#39;U&#39; symbol of the American society of Mechanical Engineers (ASME).</description>
      <dc:subject></dc:subject>
      <dc:date>2010-09-21T15:36:18+00:00</dc:date>
    </item>

    <item>
      <title>LRQA ISO 9001:2008 Certificate Sucessfully Renewed</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/lrqa_iso_90012008_certificate_sucessfully_renewed/</link>
      <guid>http://www.citech.co.uk/index.php/index/lrqa_iso_90012008_certificate_sucessfully_renewed/#When:14:56:52Z</guid>
      <description>CiTECH Energy Recovery Systems UK Ltd has been approved by Lloyd&#39;s Register Quality Assurance (LRQA) for renewal of the following Quality Management system standards: ISO 9001:2008 to 30 June 2013.</description>
      <dc:subject></dc:subject>
      <dc:date>2010-09-21T14:56:52+00:00</dc:date>
    </item>

    <item>
      <title>EKUINAS invest in Tanjung Offshore Berhad</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/ekuinas_invest_in_tanjung_offshore_berhad/</link>
      <guid>http://www.citech.co.uk/index.php/index/ekuinas_invest_in_tanjung_offshore_berhad/#When:08:39:12Z</guid>
      <description>On 17 June 2010, Tanjung Offshore Berhad (Tanjung) has proposed to undertake a private placement of 26,000,000 new Shares to Ekuiti Nasional Berhad (EKUINAS), representing approximately 10% of the total issued and paid&#45;up share capital of Tanjung at an issue price of RM1.30 per Share..</description>
      <dc:subject></dc:subject>
      <dc:date>2010-07-23T08:39:12+00:00</dc:date>
    </item>

    <item>
      <title>Sakhalin Island Field Development Offshore Russia</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/sakhalin_island_field_development_project_offshore_russia/</link>
      <guid>http://www.citech.co.uk/index.php/index/sakhalin_island_field_development_project_offshore_russia/#When:13:39:47Z</guid>
      <description>CiTECH Energy Recovery Systems UK Ltd have been awarded a contract to supply two (2) CiBAS 70 Waste Heat Recovery Units for a field development project on Sakhalin Island offshore Russia</description>
      <dc:subject></dc:subject>
      <dc:date>2010-06-21T13:39:47+00:00</dc:date>
    </item>

    <item>
      <title>Platong Gas II Project</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/platong_gas_ii_project/</link>
      <guid>http://www.citech.co.uk/index.php/index/platong_gas_ii_project/#When:13:29:39Z</guid>
      <description>Chevron Thailand Exploration and Production Ltd (Chevron) are upgrading the Platong Complex in the Gulf of Thailand.</description>
      <dc:subject></dc:subject>
      <dc:date>2010-06-21T13:29:39+00:00</dc:date>
    </item>

    <item>
      <title>Gumusut&#45;Kakap FPS Project</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/gumusut-kakap_fps_project/</link>
      <guid>http://www.citech.co.uk/index.php/index/gumusut-kakap_fps_project/#When:13:20:59Z</guid>
      <description>CiTECH Energy Recovery Systems UK Ltd were awarded the contract to supply three (3) CiBAS Waste Heat Recovery Units for Shell&#39;s multi&#45;billion dollar Gumusut&#45;Kakap deep&#45;water oil project in Malaysia.</description>
      <dc:subject></dc:subject>
      <dc:date>2010-06-21T13:20:59+00:00</dc:date>
    </item>

    <item>
      <title>CiTECH&#8482; Acquires New Headquarters</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/citech_acquires_new_headquarters/</link>
      <guid>http://www.citech.co.uk/index.php/index/citech_acquires_new_headquarters/#When:17:49:10Z</guid>
      <description>Head Operations have now moved from our manufacturing plant in Hull to our new premises in Hessle</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T17:49:10+00:00</dc:date>
    </item>

    <item>
      <title>Second Kakinada Unit Deployed</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/second_kakinada_unit_deployed/</link>
      <guid>http://www.citech.co.uk/index.php/index/second_kakinada_unit_deployed/#When:17:44:22Z</guid>
      <description>As part of the Kakinada project, which saw the transportation of unit one in the summer of 2008, late January saw the deployment of the second of the two units.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T17:44:22+00:00</dc:date>
    </item>

    <item>
      <title>Tanjung Offshore Berhad buys CiTECH&#8482;</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/tanjung_offshore_berhad_buys_citech_energy_systems_ltd/</link>
      <guid>http://www.citech.co.uk/index.php/index/tanjung_offshore_berhad_buys_citech_energy_systems_ltd/#When:16:58:37Z</guid>
      <description>We are pleased to announce that CiTECH Energy Systems Limited (&#39;the Company&#39;) has obtained a new business partner in the form of Tanjung Offshore Berhad (&#39;Tanjung&#39;).</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T16:58:37+00:00</dc:date>
    </item>

    <item>
      <title>CiBAS&#8482; Kakinada Prepared For Deployment</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/cibas_kakinada_prepared_for_deployment/</link>
      <guid>http://www.citech.co.uk/index.php/index/cibas_kakinada_prepared_for_deployment/#When:15:04:42Z</guid>
      <description>June saw the movement of the first of three units Kakinada units, the largest CiBAS&#8482; units to date.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T15:04:42+00:00</dc:date>
    </item>

    <item>
      <title>Ujung Pangkah Commission</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/ujung_pangkah_commission/</link>
      <guid>http://www.citech.co.uk/index.php/index/ujung_pangkah_commission/#When:15:04:16Z</guid>
      <description>CiTECH are commencing build to supply one CiBAS C20 package to the Taurus 60 gas turbine for Tripatra Engineers and Constructors for the Amerada Hess Liquids Development Feed Oil Treatment Facility site in Indonesia.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T15:04:16+00:00</dc:date>
    </item>

    <item>
      <title>CPOC B17 Development</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/cpoc_b17_development/</link>
      <guid>http://www.citech.co.uk/index.php/index/cpoc_b17_development/#When:15:02:49Z</guid>
      <description>We are about to commence the building of three CiBAS C30 units, required for a Taurus 60 Gas Turbine.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T15:02:49+00:00</dc:date>
    </item>

    <item>
      <title>Al Shaheen Commission</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/al_shaheen_commission/</link>
      <guid>http://www.citech.co.uk/index.php/index/al_shaheen_commission/#When:15:00:19Z</guid>
      <description>Units destined for the Al Shaheen project during development at CiTECH&#39;s Hull Fabrication plant. CiTECH will supply 10 CiBAS packages to Maersk Oil and Gas Qatar.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T15:00:19+00:00</dc:date>
    </item>

    <item>
      <title>CiTECH Acquires Manufacturing Plant</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/citech_acquires_manufacturing_plant/</link>
      <guid>http://www.citech.co.uk/index.php/index/citech_acquires_manufacturing_plant/#When:14:56:59Z</guid>
      <description>CiTECH would like to formally announce its acquisition of manufacturing facilities in Hull, which came into effect on 15th July 2007.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T14:56:59+00:00</dc:date>
    </item>

    <item>
      <title>Foroozan Commission</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/foroozan_commission/</link>
      <guid>http://www.citech.co.uk/index.php/index/foroozan_commission/#When:14:55:52Z</guid>
      <description>Two CiBAS C45 units are in build for Siemens Lincoln and will be deliverd together with Siemens SGT 400 turbines for NIOC for an offshore platform in the Persian Gulf.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T14:55:52+00:00</dc:date>
    </item>

    <item>
      <title>Frade Commission</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/frade_commission/</link>
      <guid>http://www.citech.co.uk/index.php/index/frade_commission/#When:14:52:02Z</guid>
      <description>Four CiBAS C70 series packages with supplementary firing systems are being supplied for use on board the FRADE FPSO</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T14:52:02+00:00</dc:date>
    </item>

    <item>
      <title>Bunga Pakma Orkid Commission</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/bunga_pakma_orkid_commission/</link>
      <guid>http://www.citech.co.uk/index.php/index/bunga_pakma_orkid_commission/#When:14:51:28Z</guid>
      <description>CiTECH is building three CiBAS C30 series units for Talisman Energy and will deliver the packages through Sime Derby for BOA platform in the Gulf of Thailand.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T14:51:28+00:00</dc:date>
    </item>

    <item>
      <title>Lukoil Yu Korchagin Commission</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/lukoil_yu_korchagin_commission/</link>
      <guid>http://www.citech.co.uk/index.php/index/lukoil_yu_korchagin_commission/#When:14:51:08Z</guid>
      <description>Four CiBAS C30 packages have been ordered by Lukoil through STG Engineering for Lukoil&#39;s Caspian sea platform. The units are equipped with suplementary firing systems.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T14:51:08+00:00</dc:date>
    </item>

    <item>
      <title>Nexus Commission</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/nexus_commission/</link>
      <guid>http://www.citech.co.uk/index.php/index/nexus_commission/#When:14:49:37Z</guid>
      <description>Two CiBAS C45 packages will be delivered via Samsung Heavy Industries to Nexus for their first FPSO , the units will operate in conjunction with Solar Gas Turbines</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T14:49:37+00:00</dc:date>
    </item>

    <item>
      <title>YME Commission</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/yme_commission/</link>
      <guid>http://www.citech.co.uk/index.php/index/yme_commission/#When:14:46:17Z</guid>
      <description>CiTECH will deliver two CiBAS C45 series packages to SBM Gusto MSC for the MOPUSTOR platform being delivered to Talisman for the YME field re&#45;development in Norway.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T14:46:17+00:00</dc:date>
    </item>

    <item>
      <title>Arthit Deployment &amp;amp; Installation</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/arthit_fabrication_deployment_installation/</link>
      <guid>http://www.citech.co.uk/index.php/index/arthit_fabrication_deployment_installation/#When:14:41:59Z</guid>
      <description>Arthit is shown during preparation for deployment for it&#39;s destination in the Gulf of Thailand</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T14:41:59+00:00</dc:date>
    </item>

    <item>
      <title>Sleipner Development</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/sleipner_development/</link>
      <guid>http://www.citech.co.uk/index.php/index/sleipner_development/#When:14:37:06Z</guid>
      <description>CiTECH is providing Statoil with a CiBAS unit to replace one of Sleipner&#39;s C20 recovery units. The unit has been designed to Statoil&#39;s specific requirements</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T14:37:06+00:00</dc:date>
    </item>

    <item>
      <title>AKPO</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/akpo/</link>
      <guid>http://www.citech.co.uk/index.php/index/akpo/#When:14:36:40Z</guid>
      <description>Four C25 vertical integral bypass cold casing packages are commencing fabrication by CiTECH on behalf of Rolls Royce and Technip for Total&#39;s AKPO project in Nigeria.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T14:36:40+00:00</dc:date>
    </item>

    <item>
      <title>Tahiti Fabrication &amp;amp; Installation</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/tahiti_fabrication_installation/</link>
      <guid>http://www.citech.co.uk/index.php/index/tahiti_fabrication_installation/#When:14:30:40Z</guid>
      <description>Several Units are installed on the Tahiti site in the Gulf Of Mexico, following fabrication in CiTECH&#39;s Hull yard.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T14:30:40+00:00</dc:date>
    </item>

    <item>
      <title>Ormen Lange Deployment</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/ormen_lange_deployment/</link>
      <guid>http://www.citech.co.uk/index.php/index/ormen_lange_deployment/#When:14:12:56Z</guid>
      <description>Completion of two C45 Fired Heaters led to the transportation of each unit from the CF STRUTHERS&#39; facility for shipment to site at the Norsk Hydro&#39;s Ormen Lange project in Norway.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-07T14:12:56+00:00</dc:date>
    </item>

    <item>
      <title>Petrobras P53</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/petrobras_p53/</link>
      <guid>http://www.citech.co.uk/index.php/index/petrobras_p53/#When:16:57:21Z</guid>
      <description>Four C25 Horizontal hot casing packages with damper tee boxes and separate bypass stacks are commencing fabrication</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-03T16:57:21+00:00</dc:date>
    </item>

    <item>
      <title>Snovhit LNG Transportation</title>
      <link>http://www.citech.co.uk/index.php/mediaroom/snovhit_lng_transportation/</link>
      <guid>http://www.citech.co.uk/index.php/index/snovhit_lng_transportation/#When:16:51:39Z</guid>
      <description>CiTECH Energy Recovery Systems UK supplied the Gas Turbine Heat Recovery equipment for Statoil&#39;s Snovhit project in Hammerfest on the north coast of Norway. The equipment is shown during load out and sail away/arrival operations.</description>
      <dc:subject></dc:subject>
      <dc:date>2009-07-03T16:51:39+00:00</dc:date>
    </item>

    
    </channel>
</rss>
