CiTECH have been awarded the order from Tripatra for One CiBAS C30 WHRU for the Onshore Processing Facility for the Ujung Pangkah development to provide heat to the Oil Treatment Facility plus LPG Recovery Processing System.
The CiBAS unit is designed to be cold case and to run dry, the unit is specified to recover at a combined flow rate of 123,121 kg/hr a total of 7,800 kW through a Hot Oil system (Dowtherm Q) from a single Solar Taurus 60 Gas Turbine.

The onshore process facility (OPF) will be located on the Gresik area (Maspion Complex) in East Java, North of Surabaya adjacent to the Madura straits. The OPF will receive approximately 120 mmscfd of wet sour gas from the Ujung Pangkah field and will be required to separate hydrocarbon liquids, remove H2S, dry the gas and control the hydrocarbon dew point to meet delivery specifications.