Projects

Over 300 units designed and installed around the globe.
Check out some of the projects we have completed for our clients.

Piper Bravo Tieback WHRU study

Petrofac commissioned CITECH to conduct an engineering feasibility study into the upgrading of existing WHRU equipment on the Piper Bravo platform in the North Sea Marigold field

Piper Bravo Tieback WHRU Study »

Tratayen 2

Following the order for the first CiBAS WHRU, Solar subsequently placed a further order with CiTECH for an identical CiBAS WHRU.

Tratayen 2 »

Onshore Terminal for Kg 98/2 Project

Capitalising on this achievement, CiTECH has been bestowed with the privileged task of supplying ONGC with an additional WHRU unit for their Onshore Gas Plant.

Onshore Terminal for Kg 98/2 Project »

Tratayen 1

A multi-billion-dollar pipeline transporting natural gas to Buenos Aires, Argentina, will soon be fitted with a number of CiBAS C45 units.

Tratayen 1 »

Buzios 7 P-78 FPSO

The world’s largest deepwater oil field will soon see the arrival of the Petrobras operated P-78 FPSO.

Buzios 7 P-78 FPSO »

Gallaf Project

In late 2021 Siemens Energy awarded CiTECH the contract to supply a traditional WHRU for the Gallaf platform.

Gallaf Project »

Mero 3 FPSO

Working with Siemens Energy, CiTECH provided the WHRU and exhaust ducting scope for the Mero 3 FPSO bound for Brazil.

Mero 3 FPSO »

Anasuria FPSO Exhaust Duct Replacement

Replacing equipment already in situ is always challenging – even more so when that equipment is offshore. Platform crane limits and ease of installation need to accounted for.

Anasuria FPSO Exhaust Duct Replacement »

Anchor

Following on from the success of the 3 units installed on the Tahiti spar platform, Chevron ordered a further 3 similar units for their Anchor platform destined for the Gulf of Mexico.

Anchor »

Jotun A FPSO

A single day was all it took for each of these 2 CiBAS WHRU’s to be mechanically fitted onto the existing Balder FPSO as part of the life extension project.

Jotun A FPSO »

Wytch Farm

Perenco’s Wytch Farm site in Dorset UK was the destination for 2 CiBAS units in 2020. Centrica awarded the contract for these 2 small CiBAS units, which, for the first time, are installed on reciprocating gas engines.

Wytch Farm »

Shell Penguins FPSO

In July 2018, CiTECH were awarded a contract from Solar Turbines to supply 3 CiBAS Waste Heat Recovery units and associated exhaust ducting for installation on the Shell operated Penguins FPSO.

Shell Penguins FPSO »

YND – Mærsk Inspirer

CiTECH, working with Nymo AS in Norway, have supplied 2 CiBAS C60 units and associated ducting which have been retrofitted onto the Maersk Inspirer jack-up rig.

YND – MÆRSK INSPIRER »

UzEEF Uztransgaz ORC

CiTECH were awarded the order from Turboden for three CiBAS Twinstack WHRU for retrofit installation onto existing gas turbine generators.

UzEEF Uztransgaz ORC »

Bardegg Baronia

CiTECH were awarded the order from Hyundai Heavy Industries (HHI) for two CiBAS C100 WHRU and four exhaust ducts for the Bardegg-2 Baronia EOR Development.

Bardegg Baronia »

Cendor Phase II

CiTECH have won the order from MISC Berhad to supply two CiBAS C30 WHRU for their FSPO Cendor to provide heat to the on-board Production & Process System.

Cendor Phase II »

B193 Bombay High Basin

CiTECH have won the order from Sime Darby to supply a total of Five CiBAS C30 WHRU for the ONGC B193 Platform to provide heat to the on-board Production & Process Systems.

B193 Bombay High Basin »

ELNG Retrofit

CiTECH won the order from Egyptian Maintenance Company to supply a total of Four Vertical Traditional WHRU with Integral By-pass for retrofitting existing WHRU currently running on site.

ELNG Retrofit »

Arkutun Dagi

CiTECH have been awarded the order from Solar Turbines to supply a Two CiBAS C70 WHRU for the Arkutun Dagi Platform to provide heat to the on-board Heating and Ventilation Systems.

Arkutun Dagi »

Platong Gas II

CiTECH have been awarded the order from Jay Ray McDermott for Two CiBAS C100 WHRU for the Central Processing Platform of the Platong Gas II field to provide heat to the on-board Gas Processing System.

Platong Gas II »

Gumusut Kakap

CiTECH have been awarded the order from Nuovo Pignone for Three CiBAS C100 WHRU for the Gumusut Kakap Platform to provide heat to the on-board Oil Processing System.

Gumusut Kakap »

Total USAN FPSO

CiTECH have been awarded the order from Rolls Royce Ltd for Three Traditional with Integral Bypass WHRU for the USAN FSPO to provide heat to the on-board Oil & Gas Processing System.

Total USAN FPSO »

CPOC B17 Development

CiTECH have been awarded the order from S.O.M.E PTE Ltd for Three CiBAS C30 WHRU for the B17 Field Central Processing Platform to provide heat to the on-board Gas Processing System.

CPOC B17 Development »

Ujung Pangkah

CiTECH have been awarded the order from Tripatra for One CiBAS C30 WHRU for the Onshore Processing Facility for the Ujung Pangkah development.

Ujung Pangkah »

SBM YME

CiTECH have been awarded the order from SBM Gusto for Two CiBAS C45 WHRU for the SBM YME Mopstor to provide heat to the on-board Oil & Gas Processing System.

SBM YME »

Yuri Korchagin LSP - 1

CiTECH have been awarded the order from Stroytransgaz for Four CiBAS C30 WHRU for the Ice Resistant Platform LSP-1 to provide heat to the Ice Protection Systems.

Yuri Korchagin LSP – 1 »

OSX 1 (NEXUS 1)

CiTECH have been awarded the order from Samsung Heavy Industries for Two CiBAS C70 WHRU for the NEXUS 1 FSPO to provide heat to the on-board Oil & Gas Processing System.

OSX 1 (NEXUS 1) »

Bunga Pakma

CiTECH have been awarded the order from Tanjung SQD Berhad for Three CiBAS C30 WHRU for the Bunga Pakma Orchid A development to provide heat to the on-board Gas Processing System.

Bunga Pakma »

Kakinada

CiTECH have been awarded the order from Siemens for Three CiBAS C100 WHRU for the Kakinada Onshore Terminal to provide heat to the Gas Processing System.

Kakinada »

Vasai East

CiTECH have been awarded the order from Samsung Heavy Industries for three traditional WHRU with a Separate Bypass for the Vasai East platform to provide heat to the on-board Gas Processing System.

Vasai East »

Frade FPSO

CiTECH have been awarded the order from SBM Imodco Houston for four CiBAS C70 WHRU for the FPSO Frade to provide heat to the on-board Gas Processing System.

Frade FPSO »

Al Shaheen Platforms CE/ED/GD

CiTECH were awarded the order from Siemens for four CiBAS C100 WHRU for the Al Shaheen CE/ED/GD Platforms to provide heat to the on-board Oil and Gas Processing System.

Al Shaheen Platforms CE/ED/GD »

Al Shaheen Platform BG

CiTECH was awarded the order from Solar Gas Turbines for four CiBAS C45 WHRU for the Al Shaheen BG Platform to provide heat to the on-board Oil and Gas Processing System.

Al Shaheen Platform BG »

Al Shaheen Platform AF

CiTECH were awarded the order from Solar Gas Turbines for two CiBAS C45 WHRU for the Al Shaheen AF Platform to provide heat to the on-board Oil and Gas Processing System.

Al Shaheen Platform AF »

Foroozan

CiTECH have been awarded the order from Siemens for two CiBAS C45 WHRU for the Foroozan Platform to provide heat to the on-board Gas Processing System.

Foroozan »

Sleipner

CiTECH have been awarded the order from Dresser Rand/Vetco for one CiBAS C100 WHRU for the Sleipner Platform to provide heat to the on-board Gas Processing System.

Sleipner »

Tahiti

CiTECH have been awarded the order from Mustang Engineering for three CiBAS C45 WHRU for the Tahiti Platform to provide heat to the on-board Oil and Gas Processing System.

Tahiti »

Arthit

CiTECH have been awarded the order from Unocal/Thai Oils for a total of seven CiBAS WHRU for the Arthit Central Processing Platform to provide heat to the on-board Gas Dehydration and Processing Systems.

Arthit »

Ekofisk 2/4K

CiTECH have been awarded the order from ABB Offshore Systems for two Horizontal CiBAS C70 WHRU for the Ekofish 2/4K Platform to provide heat to the on-board Oil and Gas Processing System.

Ekofisk 2/4K »

Betara Complex Development

The Betara Gas Processing Plant was developed on the island of Sumatra, Indonesia, to produce sales gas from the North Geragai, Makmur, Northeast Betara, and Gemah gas fields for pipeline delivery to Singapore.

Betara Complex Development »

Lincoln

CiTECH in cooperation with Alstom Gas Turbines Lincoln have installed a development unit of their patented Compact Circular Waste Heat Recovery Unit known as CiBAS on their site.

Lincoln »

GLOBAL MARKET

Since the roots of our company our units have been installed across the globe to help our clients recoup waste heat and reduce carbon emissions.

Please click on the map below to see details of our most recent projects.

Terms of Service | Privacy Policy
© Copyright 2023 CiTECH. All Rights Reserved.
Website managed by Brand North | website design sheffield