Betara Complex Development

CiTECH have been awarded the order from SFER Jabung Ltd for three CiBAS C100 WHRU for the Betara Complex Platform to provide heat to their Gas Process Terminal. The CiBAS units are designed to be cold casing and run dry, the units are specified to recoup at a combined flow rate of 57,435kg/hr a total thermal duty of 11,700kwth through a Regeneration Gas system (MEMGUARD Feed Gas / MOLSIEVE) recovering heat from three Hitachi H25 Gas Turbine.

The Betara Gas Processing Plant was developed on the island of Sumatra, Indonesia, to produce sales gas from the North Geragai, Makmur, Northeast Betara, and Gemah gas fields for pipeline delivery to Singapore. The gas will be used mainly by Singapore Power to generate electrical power.

Project Info

Client:
SFER Jabung Ltd
Owner/Operator:
Petro China International
Location:
Onshore, Indonesia
Position:
0°59'45.2" Longitude 103°31'31.9" Latitude
CiBAS Model:
C100
Qty:
3
Thermal Duty:
3,900kw th
Flow:
19,145 kg/hr
Terms of Service | Privacy Policy
© Copyright 2023 CiTECH. All Rights Reserved.
Website managed by Brand North | website design sheffield