Bunga Pakma

CiTECH have been awarded the order from Tanjung SQD Berhad for Three CiBAS C30 WHRU for the Bunga Pakma Orchid A development to provide heat to the on-board Gas Processing System. The CiBAS units are designed to be cold case and run dry, the units are specified to recoup at a combined flow rate of 606,264kg/hr a total thermal duty of 12,939kwth through a Hot Oil (Therminol 66) system recovering heat from three Solar Taurus 70 Gas Turbines.

Talisman Malaysia is the operator for the project, which involves development of the West Bunga Kekwa, East Bunga Kekwa-Cai Nuoc, East Bunga Raya, West Bunga Raya, NW Bunga Raya and Bunga Seroja fields, located in the southeast portion of the block. Four new wellhead platforms, a central processing platform, compression annex platform, floating storage offloading vessel and inter-field pipelines have been installed. These facilities have a production capacity of 60,000 bbls/d of oil and 270 mmcf/d of gas.

Project Info

Client:
Tanjung SQD Berhad
Owner/Operator:
Talisman Malaysia
Location:
Offshore Malaysia/ Vietnam
Position:
5°02'28.6" Longitude 99°54'43.2" Latitude
CiBAS Model:
C30
Qty:
3
Thermal Duty:
4,313kw th
Flow:
202,088 kg/hr
© Copyright 2024 CiTECH. All Rights Reserved.
Website managed by Brand North | website design sheffield