Mero 3 FPSO

Working with Siemens Energy, CiTECH provided the WHRU and exhaust ducting scope for the Mero 3 FPSO bound for Brazil. We supplied four CiBAS WHRU, including ducting and stacks to be installed onto the platform’s Gas Turbine Generators (GTG) and also three self-supported 22m high exhaust stack and silencer systems for the Gas Turbine Compressors (GTC). All engineered to meet the high movements and forces associated with FPSO installations.

To meet the Mero 3 project Local Content requirements CITECH fabricated the exhaust ducting and stacks using local Brazilian partners, whilst still maintaining the exceptionally high engineering and quality standards expected by the offshore Oil & Gas industry.

Project Info

Client:
Siemens Energy
Owner/Operator:
Petrobras
Location:
Offshore Brazil
Unit Model:
C100 units and Exhaust stacks
Qty:
4 CiBAS WHRU and 3 additional stacks
Thermal Duty:
26 MW
Flow:
1,020,000 kg/hr