OSX 1 (NEXUS 1)

CiTECH have been awarded the order from Samsung Heavy Industries for Two CiBAS C70 WHRU for the NEXUS 1 FSPO to provide heat to the on-board Oil & Gas Processing System. The CiBAS units are designed to be cold case and to run flooded, the units are specified to recover at a combined flow rate of 562,600kgs/hr and a total thermal duty of 30,000kwth through a Water Glycol system recovering heat from two Solar Titan 130 Gas Turbines.

The units were delivered as required to Samsung and the FSPO Nexus 1 operated offshore Norway but Nexus ran into financial difficulties and the vessel was sold onto OGX a Brazilian Oil Company. After modification the FSPO now operates in the Campos Basin

Project Info

Client:
Samsung Heavy Industries
Owner/Operator:
OGX/BW Offshore
Location:
Offshore Brazil
Position:
-23°27'43.4" Longitude -42°41'26.6" Latitude
CiBAS Model:
C70
Qty:
2
Thermal Duty:
15,000kw th
Flow:
281,300 kgs/hr
Terms of Service | Privacy Policy
© Copyright 2023 CiTECH. All Rights Reserved.
Website managed by Brand North | website design sheffield