Petrofac

Petrofac commissioned CITECH to conduct an engineering feasibility study into the upgrading of existing WHRU equipment on the Piper Bravo platform in the North Sea Marigold field. The study, looking at several options to increase the thermal duty of the installed WHRU equipment, will enable our client to select the most cost-effective method of meeting new heat duty demands for a future sub-sea tieback project.

CiTECH can provide numerous engineering studies and services on new or existing WHRU equipment to maximise the environmental and cost saving potential for a wide range onshore and offshore applications

Project Info

Client:
Petrofac
Location:
North Sea, UK
Unit Model:
Traditional waste heat recovery unit - study
© Copyright 2024 CiTECH. All Rights Reserved.
Website managed by Brand North | website design sheffield