Muhibbah Fabrication Yard Facilities Port Klang Malaysia
Total yard area |
100 Acres |
Jetty Water Depth |
-6m to -12m |
Soil Bearing |
204kN/m2 (20MT/m2) |
Load Out Jetty Capacity |
6,000 Tons |
Annual Yard Capacity |
25,000 Tons |
Covered Fab Area |
15,000 m2 |
Open Fab Area |
35,000 m2 |
CAPEX up to now |
RM 150 Million |
Location |
Port Klang with access to Straits of Malacca |
Fabrication Yard Covered Area
Covered Fab Area |
Overhead Cranes |
Factory Dimensions
|
|
20 tons |
25 tons |
25 tons |
Height under Hook |
Length |
Width |
15,000 m2 |
3 nos |
4 nos |
3 nos |
21 m |
138 m |
26 m and 36 m |

Fabrication Yard – Covered Pipe Spool
Pipe Spool Shop Capacity |
CNC Pipe Profiling Capacity |
Overhead Crane Capacity |
15,000 di-in per month |
1 x 600mm dia. CNC 1 x 1000mm dia. CNC (at covered workshop) |
1 x 10 Ton |

CiTECH Stainless Steel and Fabrication Yard
Site |
Total Site Area |
Covered Fab Area |
Yard Space |
Storage Area |
Fabrication Yard |
18,828m2 |
1,354 m2 |
1,354 m2 |
114 m2 |
Stainless Steel Workshop |
1,350m2 |
1,350 m2 |
N/A |
N/A |
Here is the location of where the plug and sleeve will be fabricated.
The helical heat exchanger is coiled and heat treated in the fabrication shop, which is also where all the CiBAS component parts are assembled after fabricated elsewhere in the fabrication yard.
Fabrication Yard – Load out Jetty
Load Out Jetty Capacity |
Water depth at Jetty |
Load Out Operations |
Capacity |
Length |
Width |
|
|
|
|
6,000 Tons (upgradable to 10,000 tons) |
43 metres |
46 metres |
-6 to -12 metres |
Single/ Tandem Lifting |
Multi-Axle (RORO) |
Skidding |